A good window replacement specification for housing association stock starts with what’s on site. It points to the Building Regulations for performance and safety, and it plans for repairs from day one. Written well, it can be called off block by block without being rewritten each time.
Exterior Plas is a family run window and door manufacturer founded in 1988 and based in Thornwood, Epping. Housing associations have historically been one of our main sectors. This guide sets out what a housing association window replacement specification should contain, and it’s aimed at the surveyors and asset managers who write one.
Key takeaways
- Survey the stock first.
- Point to the Building Regulations and Approved Documents rather than writing your own performance rules from scratch.
- A framework specification has to work across many building ages and opening sizes, so standardise the product and leave the measuring to site.
- Put aftercare in the brief.
Start with a survey of the stock you have
A specification is only as good as the survey behind it. Before you write anything, you’ll want a record of when each property was built and which window systems are already fitted.
Openings are rarely as uniform as the asset register suggests. Houses on the same street, built in the same decade, can have openings that differ enough to matter for a made to measure product, especially where earlier replacements were packed out or reduced. Note access too, since scaffold and parking both affect how a call off runs. Occupied homes also need different handling from voids, so it’s worth recording which is which.
What a housing association window replacement specification should set out
It should state the product and how it performs, then cover safety and what happens after handover. Most of the technical detail already sits in the regulations. You point to them and add what your stock needs.
| Specification item | What to state | Why it matters |
|---|---|---|
| Product | System and material | Keeps bids comparable |
| Thermal performance | Compliance with current Approved Document L | Limits heat loss |
| Opening type | Casement or tilt and turn, plus where restrictors go | Resident safety on upper floors |
| Safety glazing | Where Approved Document K requires it | Lower injury risk in critical locations |
| Means of escape | Which rooms need escape windows | A replacement mustn’t reduce escape potential |
| Ventilation | Trickle vents or equivalent background ventilation | Helps control condensation and mould |
| Fire requirements | Windows near escape routes or boundaries | Links the brief to the fire strategy |
| Aftercare | Who handles repairs and spares | Keeps windows working |
In blocks, where the fire strategy calls for them, list fire rated windows as their own line so they don’t get lost in the general schedule.
The regulations to reference
Replacement windows are controlled fittings under the Building Regulations, so the work has to comply. The Planning Portal guidance on doors and windows explains that the regulations have applied to all replacement glazing since 1 April 2002, covering thermal performance, safety, air supply, means of escape and ventilation.
Approved Document L sets the thermal limits. Approved Document K covers safety glazing in low panes and in or beside doors. A replacement window should also give at least the same potential for escape as the one it replaces, which matters most in upper floor bedrooms. For blocks of flats, Approved Document B covers fire safety, including fire spread near boundaries.
The Decent Homes Standard guidance is useful background. Social homes are expected to be in reasonable repair and to give tenants a reasonable degree of thermal comfort.
There are 2 routes. Either an installer registered with a competent person scheme self certifies the work, or building control signs it off, and your specification should say which one you expect.
How frameworks and call offs change the specification
On a framework, the specification is usually written once and then called off block by block. So it has to suit a 1960s maisonette block and a Victorian conversion alike.
Standardise what you can. Fix the product range and compliance route at framework level so every call off starts from the same baseline, then leave sizes and any heritage details to the survey at call off stage, because that’s where the variation lives. Say how departures get agreed. That way a surveyor isn’t stuck when an opening doesn’t fit.
Why it helps when the manufacturer also fits and repairs
When the firm that makes the windows also fits them, there are fewer gaps between the specification and what ends up in the wall. Made to measure production follows the site survey directly, which suits older stock where openings are rarely square.
We fabricate REHAU uPVC systems in our factory in Thornwood, which covers around 15,000 sq ft and has CNC machinery. We also run a reactive maintenance department, so repairs come back to the firm that made the windows. You can read about our window and door work for social landlords on our service page.
When a full replacement specification is not the right choice
Sometimes it’s the wrong tool. Where windows have plenty of life left, repairs may make more sense, and our guide to reactive and cyclical window maintenance explains the difference.
Listed buildings and conservation areas are another case, as the local planning authority may expect repair, like for like replacement or secondary glazing, so check with them first. For a handful of voids, a short brief is usually enough.
To talk through a specification or a call off, ring us on 01992 578 903, Monday to Friday, 9am to 5pm.
FAQs
Yes. They’re controlled fittings, so the work must meet the Building Regulations, including the rules on heat loss and escape. An installer registered with a competent person scheme can self certify it. If not, building control signs it off.
Keep it short. State the product and opening type, then any safety glazing or escape needs and the compliance route you expect. Ask for each property to be measured on site, because openings can vary even along 1 street, and say who handles repairs once the windows are in.
It can, if it’s written with that in mind from the start. Fix the product range and compliance requirements at framework level. Sizes are then measured at each call off.
Background ventilation shouldn’t be made worse when windows are replaced, so you’ll often need trickle vents, particularly where the old windows had them. In social housing it’s more than a technical point, because poor ventilation feeds condensation and mould, and that affects whether a home meets the standard tenants are entitled to expect. The Approved Documents give the detail.